New Home Photos

We are open and ready to serve the LGBT community from our new state-of-the-art facility. We can't wait to see you and show off the new, larger Rainbow Alley and SAGE spaces, as well as conference and meeting rooms and a rooftop patio with views of the Capitol and the mountains.

The Center posted photos of the construction progress at our new home at 1301 E. Colfax Ave. from January to July 2010, as well as photos from our opening day and grand opening celebrations.  



A construction worker looks at the steel rods that need to be removed before the elevator can be built.

The elevator walls going up in the basement of the building.

Workers removing the large Video One sign on the Colfax-facing side of the building.

A worker on March 11 braces the wall that contains the James Dean mural to cut a large hole in it for windows.

The walls for the elevator shaft have been constructed through the first three floors of the building as of March 11.

Home of The Centers future rooftop patio. The hole is where the elevator will be built.

Workers removing bricks (and the James Dean mural) on March 12 on the Colfax-facing wall of the building to make way for new energy-efficient windows.

The Centers staff just before they toured the building on April 6.

Rainbow Alley staff Moises Munoz and Andie Lyons enjoying their hard hats.

Page 1 2 3 4 of 5
Donate Now!
Share |